Which is need to pay special attention to HZS50 ready-mixed concrete mixing plant foundation construction ?
1, HZS50 level must be stirred with a spirit level and a super flat base stations detected, the loss caused by uneven Ruoyin foundation is not responsible.
2. A small HZS50 mixing station ready drawings embedded iron, embedded iron can not arbitrarily change the size, the changes must be notified, please contact the site technical guidance personnel, make a written proof;
3, requires mobile concrete batching plant for sale foundation required laying steel mesh, steel anchors are not less than the required size of the drawing; base required excavation depth and width of not less than drawing the desired size;
4, and may not arbitrarily change the size of the drawings are marked, if there are any changes need to notify the site technical guidance personnel, make a written certificate;
5, according to the technical requirements by taking small HZS50 mixing station and find a good reference point, size error between the two basis shall not be greater than 50 mm, with lime from the center of the base and the mining base size limits;
6, foundation excavation qualified after pouring concrete, need to secondary pouring must be the second pouring, label to C20 - C30;
7, when digging the modular concrete mixing plant foundation, with steel or wood fern reserve base centerline position, clear labeling requirements, based on the same two embedded iron centerline to the same line, the deviation not greater than 20mm.
http://www.bizbilla.com/
1, HZS50 level must be stirred with a spirit level and a super flat base stations detected, the loss caused by uneven Ruoyin foundation is not responsible.
2. A small HZS50 mixing station ready drawings embedded iron, embedded iron can not arbitrarily change the size, the changes must be notified, please contact the site technical guidance personnel, make a written proof;
3, requires mobile concrete batching plant for sale foundation required laying steel mesh, steel anchors are not less than the required size of the drawing; base required excavation depth and width of not less than drawing the desired size;
4, and may not arbitrarily change the size of the drawings are marked, if there are any changes need to notify the site technical guidance personnel, make a written certificate;
5, according to the technical requirements by taking small HZS50 mixing station and find a good reference point, size error between the two basis shall not be greater than 50 mm, with lime from the center of the base and the mining base size limits;
6, foundation excavation qualified after pouring concrete, need to secondary pouring must be the second pouring, label to C20 - C30;
7, when digging the modular concrete mixing plant foundation, with steel or wood fern reserve base centerline position, clear labeling requirements, based on the same two embedded iron centerline to the same line, the deviation not greater than 20mm.